The MOL Group has expanded production of rubberised bitumen at its Zala site at Zalaegerszeg in Hungary.
New Hungarian Rubber Bitumen Plant for Tyre Waste Completed
The new plant can produce about 96 tons of rubber bitumen per day, annually this translates into 20,000 tons of raw material for road construction, enough to construct a new 2×1 lane 200 km highway or to refurbish the upper layer of 600 km of a 2×1 lane highway.
In 2012, MOL opened and successfully operated a pilot plant for rubber bitumen with an annual capacity of 5,000 tons at the Zala Site. In response to increased ...
New Hungarian Rubber Bitumen Plant for Tyre Waste Completed
The new plant can produce about 96 tons of rubber bitumen per day, annually this translates into 20,000 tons of raw material for road construction, enough to construct a new 2×1 lane 200 km highway or to refurbish the upper layer of 600 km of a 2×1 lane highway.
In 2012, MOL opened and successfully operated a pilot plant for rubber bitumen with an annual capacity of 5,000 tons at the Zala Site. In response to increased ...







